May 19th had the plumbers out working on the pipework, solding the joints and getting everything laid out.The temperature was still chilly, but the weather is starting to warm up now.
Aug 27 2009 by Gerry Straathof.
Wires in the house, painstakingly placed to poke correctly through the floor.Aug 27 2009 by Gerry Straathof.
Pipes are carefully laid out for size.
Aug 27 2009 by Gerry Straathof.
The main connector is in the right spotAug 27 2009 by Gerry Straathof.
Many hands working to get the plumbing in placeAug 27 2009 by Gerry Straathof.
And everything is insulated to prevent melting while the pipes are soldered
Aug 27 2009 by Gerry Straathof.
Lots of people working to get the job done.Aug 27 2009 by Gerry Straathof.
Even with all the people working on the wiring and plumbing, it doesn't seem to be quite as fast as planned in our timeline.